HomeRepair guidesHweiteh.Com

Hweiteh.Com Repair Guides

78 step-by-step procedures compiled from Hweiteh.Com service manuals.

STATION BUTTON on the EVC control panel.

General procedure

Repair Procedure

General procedure

Service Procedure

General procedure

Service Procedure

General procedure

Transom Aquamatic

General procedure

Twin engine installation

General procedure

Centerline spacing

General procedure

Place a mark at (A), the selected engine centerline

General procedure

X-measurement

General procedure

DPR (d)

General procedure

DPR only:

General procedure

Twin installations with a stepped hull:

General procedure

Start by reducing X-measurement with 10 mm (3/8"). Check and test position of drive

General procedure

Minimum engine center distance

General procedure

Measure X along

General procedure

Crankshaft

General procedure

Keel line

General procedure

Transom angle, α°

General procedure

Twin installation

General procedure

Transom Aquamatic

General procedure

Using the drill fixture

General procedure

Drill all six holes Ø 14 mm (9/16")

General procedure

Aquamatic Transom

General procedure

Using the paper template

General procedure

Remove the template

General procedure

Transom Aquamatic

General procedure

Installing the transom shield

General procedure

Aquamatic Transom

General procedure

IMPORTANT! The trim pump must be installed

General procedure

Clamp the hydraulic hoses to the trim pump

General procedure

IMPORTANT! The ends of the hoses must al-

General procedure

If the radius is smaller, the control will be stiff to oper-

General procedure

Tighten the nuts evenly

General procedure

Tightening torque: 80 Nm (57.8 lbf.ft)

General procedure

Transom Aquamatic

General procedure

Installing gear shift actuator

General procedure

IMPORTANT! Do not forget to power up the

General procedure

EVC system before attaching the shift cable to

General procedure

IMPORTANT! The shift actuator must be posi-

General procedure

Aquamatic applications

General procedure

Engine foundation

General procedure

Measurement (D) crankshaft centerline (CC) – en-

General procedure

Build in drain channels to allow water to drain to the

General procedure

For information about Jack shaft installation, please

General procedure

A = Spacer material, preferably high density material

General procedure

B = Fiberglass, approx. 10–15 mm (0.4–0.6")

General procedure

C = Flat bar, galvanized, approx. 10 mm (0.4")

General procedure

W = Flat bar width

General procedure

E = Engine bed min. width: 112 mm (4.4")

General procedure

The engine bed should be filled, to reduce noise and

General procedure

Build up the engine bed with spacer material (A) so

General procedure

Engine foundation Aquamatic

General procedure

SEL

General procedure

Then remove the special tool

General procedure

The figure shows the drill jig in position D6

General procedure

Aquamatic applications

General procedure

Steering system

General procedure

IMPORTANT! Plug no. 2 must never

General procedure

Single installation - DPH/DPR

General procedure

Main and secondary helm station

General procedure

Connections to oil cooler and servo pump not shown

General procedure

Please refer to figure above

General procedure

The relief valve (2a) is replaced by a plug

General procedure

One helm station

General procedure

Steering system Aquamatic

General procedure

Single installation - DPH/DPR

General procedure

One helmstation

General procedure

Autopilot installed

General procedure

Main and secondary helmstation

General procedure

Connections to oil cooler and servo pump not shown

General procedure

Please refer to figure above

General procedure

IMPORTANT! Plug no. 2 must never

General procedure

The relief valve (2a) is replaced by a plug

General procedure

Aquamatic Steering system

General procedure

Twin installation - DPH

General procedure

Twin installation - DPR

General procedure

Twin Engine Installation Setup

General procedure

Engine Bed Installation

General procedure