Cummins/Onan 2100 Series — Convert Day Tank Controller 120 VAC to 240 VAC
Installation · Day tank pump controller
For the Cummins/Onan 2100 Series, from the Cummins/Onan service manual.
Applies to: Cummins/Onan DGBB, Cummins/Onan DGBC, Cummins/Onan DGCA, Cummins/Onan DGCB, Cummins/Onan DGCG, Cummins/Onan DGDA, Cummins/Onan DGDB, Cummins/Onan DGDK, Cummins/Onan DGFA, Cummins/Onan DGFB, Cummins/Onan DGFC
Procedure
- Remove jumpers between TB1-5 & TB1-6 and TB1-7 & TB1-8; connect two jumpers between TB1-6 and TB1-7.
- Move selector switch S103 on control PCB to down position for 240 VAC.
- On control transformer, remove jumpers between H1 & H3 and H2 & H4; connect two jumpers between H2 and H3.
Specs & values
- S103 down position for 240 VAC
Full service-parts list: Cummins/Onan DGBB →, Cummins/Onan DGBC →, Cummins/Onan DGCA →, Cummins/Onan DGCB →, Cummins/Onan DGDA →, Cummins/Onan DGDB →, Cummins/Onan DGFA →, Cummins/Onan DGFB →, Cummins/Onan DGFC →
Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.