Home›Repair guides›Cummins/Onan›Testing the Float Switch Assembly

Cummins/Onan PCC Control 3100 Series — Testing the Float Switch Assembly

Testing & diagnosis · Day tank float switch assembly

For the Cummins/Onan PCC Control 3100 Series, from the Cummins/Onan service manual.

Applies to: Cummins/Onan DFAA, Cummins/Onan DFAB, Cummins/Onan DFAC, Cummins/Onan DFBF, Cummins/Onan DFCB, Cummins/Onan DFCC, Cummins/Onan DFCE, Cummins/Onan DFE

Procedure

  1. Remove the fuel pump control cover, disconnect the wiring jack and unscrew the assembly from the top of the day tank.
  2. With an ohmmeter, test for electrical continuity between each pair of colored leads while holding the assembly vertical; all readings should be zero.
  3. Lift each float, in turn, to 1/8 inch (3 mm) below the C-clip stop above it and test for continuity; all readings should be infinity.
  4. Use pipe thread sealant when replacing the assembly.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Float lift clearance: 1/8 inch (3 mm) below the C-clip stop

Full service-parts list: Cummins/Onan DFBF →, Cummins/Onan DFCC →, Cummins/Onan DFCE →, Cummins/Onan DFE →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →