Home›Repair guides›Cummins/Onan›Permanent Magnet (PMG) Installation

Cummins/Onan LS-15M — Permanent Magnet (PMG) Installation

Repair & overhaul · PMG assembly

For the Cummins/Onan LS-15M, from the Cummins/Onan service manual.

Applies to: Cummins/Onan DFAA, Cummins/Onan DFAB, Cummins/Onan DFAC, Cummins/Onan DFBF, Cummins/Onan DFCB, Cummins/Onan DFCC, Cummins/Onan DFCE, Cummins/Onan DFE

Before you start

  • The highly magnetic rotor will attract the stator core; take care to avoid any contact which may damage the windings.

Procedure

  1. Install the complete rotor assembly to the end of the main rotor shaft using the hex head through-bolt.
  2. Carefully locate the stator housing to position on the generator endbracket.
  3. Fasten in place using the 4 bolts and clamps, and tighten securely.
  4. Connect the PMG wiring harness connector.
  5. Install the PMG assembly cover using the three M5x12mm capscrews and lockwashers.
  6. HC4-7 Control Housing: Install the control housing grille and access covers.

Specs & values

  • Three M5x12mm capscrews

Full service-parts list: Cummins/Onan DFBF →, Cummins/Onan DFCC →, Cummins/Onan DFCE →, Cummins/Onan DFE →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →