Home›Repair guides›Cummins/Onan›Drying the Windings

Cummins/Onan — Drying the Windings

Maintenance · Generator windings

From a Cummins/Onan service manual — check it applies to your exact model before use.

Applies to: Cummins/Onan DFAA, Cummins/Onan DFAB, Cummins/Onan DFAC, Cummins/Onan DFBF, Cummins/Onan DFCB, Cummins/Onan DFCC, Cummins/Onan DFCE, Cummins/Onan DFE

Before you start

  • Voltage must begin at zero volts and be gradually increased or equipment damage will result.

Procedure

  1. Bolt the generator three phase output terminals together.
  2. Remove accessory box cover; remove plug P10 from A37 J10.
  3. Connect variable 12 VDC positive to P10-6 (X), negative to P10-3 (XX).
  4. Attach clamp-on ammeter; adjust source for zero voltage and start set.
  5. Slowly increase excitation to highest current without exceeding rating.
  6. Run the genset approximately one hour, then repeat insulation tests.
  7. Continue drying if further drying time is indicated.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Full service-parts list: Cummins/Onan DFBF →, Cummins/Onan DFCC →, Cummins/Onan DFCE →, Cummins/Onan DFE →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →