Home›Repair guides›Kohler›Installation Procedure

Kohler — Installation Procedure

Installation · Network bridge GM58703

From a Kohler service manual covering: 12RES, 15RES, 15REYG, 15RYG, 17RES, 18RES, 30 RYG, 30RES, 30REYG, 8.5RES. Check it applies to your exact model before use.

Applies to: Kohler 12RES, Kohler 15RES, Kohler 15REYG, Kohler 15RYG, Kohler 17RES, Kohler 18RES, Kohler 30 RYG, Kohler 30RES, Kohler 30REYG, Kohler 8.5RES

Before you start

  • Accidental starting can cause severe injury or death. Disconnect the battery cables, negative lead first.
  • Hazardous voltage. Disconnect all power sources before opening the enclosure.

Procedure

  1. Place the generator set master switch in the OFF position.
  2. Disconnect the power to the battery charger, if equipped.
  3. Disconnect the generator set engine starting battery(ies), negative lead first.
  4. Determine whether the network bridge will be mounted inside the enclosure or in a remote location.
  5. For a remote location, find a protected location; do not install the bridge outdoors.
  6. Maximum cable length between the network bridge and the controller is 36.6 m (120 ft.).
  7. Proceed to the bridge mounting instructions for your generator set model (Figure 8).

Specs & values

  • Maximum cable length between bridge and generator set controller: 36.6 m (120 ft.)

Full service-parts list: Kohler 12RES →, Kohler 15RES →, Kohler 15REYG →, Kohler 15RYG →, Kohler 17RES →, Kohler 18RES →, Kohler 30 RYG →, Kohler 30RES →, Kohler 30REYG →, Kohler 8.5RES →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →