Home›Repair guides›Kohler›8.5/12RES Bridge Installation (GM62630-KP3)

Kohler — 8.5/12RES Bridge Installation (GM62630-KP3)

Installation · Network bridge GM58703

From a Kohler service manual covering: 12RES, 15RES, 15REYG, 15RYG, 17RES, 18RES, 30 RYG, 30RES, 30REYG, 8.5RES. Check it applies to your exact model before use.

Applies to: Kohler 12RES, Kohler 15RES, Kohler 15REYG, Kohler 15RYG, Kohler 17RES, Kohler 18RES, Kohler 30 RYG, Kohler 30RES, Kohler 30REYG, Kohler 8.5RES

Procedure

  1. Remove existing junction box panel GM60625. Save the hardware and seal for reuse.
  2. Mount network bridge GM58703 onto the new panel using two screws X-51-15, washers M125A-04-80, and nuts M934-04-50.
  3. Install new J-box panel GM66795 as shown. Use the existing hardware and seal X-6422-31.
  4. Affix decal GM54820 in the location shown.
  5. Proceed to Section 6, Network Bridge Connection.

Full service-parts list: Kohler 12RES →, Kohler 15RES →, Kohler 15REYG →, Kohler 15RYG →, Kohler 17RES →, Kohler 18RES →, Kohler 30 RYG →, Kohler 30RES →, Kohler 30REYG →, Kohler 8.5RES →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →