Home›Repair guides›Kohler›17/18RES Bridge Installation (GM62630-KP1)

Kohler — 17/18RES Bridge Installation (GM62630-KP1)

Installation · Network bridge GM58703

From a Kohler service manual covering: 12RES, 15RES, 15REYG, 15RYG, 17RES, 18RES, 30 RYG, 30RES, 30REYG, 8.5RES. Check it applies to your exact model before use.

Applies to: Kohler 12RES, Kohler 15RES, Kohler 15REYG, Kohler 15RYG, Kohler 17RES, Kohler 18RES, Kohler 30 RYG, Kohler 30RES, Kohler 30REYG, Kohler 8.5RES

Procedure

  1. Open the enclosure and remove the front panel to access the controller junction box. Cover internal components.
  2. Drill a hole for the customer-supplied Ethernet cable at the location shown.
  3. Drill a 38.1 mm (1.5 in.) hole in the bottom of the junction box. Insert bushing X-634-28.
  4. Route connector P21 of Y-harness GM62626 through this opening.
  5. Drill two 4.8 mm (3/16 in.) mounting holes in the front panel at the locations shown.
  6. Use two screws M7985A-04010-20, washers X-6278-8, and nuts M934-04-50 to mount network bridge GM58703.
  7. Proceed to Section 6, Network Bridge Connection.

Specs & values

  • 38.1 mm (1.5 in.) hole for Y-harness
  • 4.8 mm (3/16 in.) mounting holes

Full service-parts list: Kohler 12RES →, Kohler 15RES →, Kohler 15REYG →, Kohler 15RYG →, Kohler 17RES →, Kohler 18RES →, Kohler 30 RYG →, Kohler 30RES →, Kohler 30REYG →, Kohler 8.5RES →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →