Home›Repair guides›Cummins/Onan›Megger and PI Test

Cummins/Onan NTA855 — Megger and PI Test

Testing & diagnosis · Generator windings

For the Cummins/Onan NTA855, from the Cummins/Onan service manual.

Applies to: Cummins/Onan DFAB, Cummins/Onan DFAC, Cummins/Onan DFBF, Cummins/Onan DFCC, Cummins/Onan DFCE, Cummins/Onan NTA855, Cummins/Onan LTA10 engine, Cummins/Onan NT855 engine, Cummins/Onan NTA855 engine

Before you start

  • Medium-voltage, 601 to 15,000 volts, present special hazards of severe personal injury or death.
  • Windings of medium voltage generator sets must be dry before the generator is operated.

Procedure

  1. Perform the Generator Set Grounding Procedure.
  2. Disconnect plug J10 from voltage regulator output stage module and AC control input leads marked 4, 5, 6, 7 and 8.
  3. If RTD option installed, ground all six RTD temperature leads (18 leads total).
  4. Remove and separate neutral leads from generator load terminal marked N.
  5. Connect megger between one stator phase and ground while grounding other two phases; conduct test.
  6. Repeat for the other two phases.
  7. Disconnect main rotor and voltage suppressor leads from terminals F1+ and F2- and isolate from ground.
  8. Connect megger between one rotor lead and ground and conduct the test.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Megger Test applies voltage for up to one minute
  • PI Test applies voltage for ten minutes; ratio of ten-minute to one-minute reading; ratio of two or greater is good

Full service-parts list: Cummins/Onan DFBF →, Cummins/Onan DFCC →, Cummins/Onan DFCE →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →