Home›Repair guides›Generac›Testing Under Load (Post Installation)

Generac — Testing Under Load (Post Installation)

Installation · generator

From a Generac owner's manual covering: QUIETPACT 55, QUIETPACT 65, QUIETPACT 75, QuietPact 55 G, QuietPact 55 LP, QuietPact 65, QuietPact 65 LP, QuietPact 75, QuietPact 75 LP. Check it applies to your exact model before use.

Applies to: Generac QUIETPACT 55, Generac QuietPact 65, Generac QuietPact 75, Generac QuietPact 75 LP

Before you start

  • You must not allow the unit to overheat during prolonged operation.

Procedure

  1. Apply electrical loads equal to about 75 to 100 percent of the unit's rated wattage/amperage capacity.
  2. Let the unit run at least 30 minutes with load applied.
  3. Check that the unit is not running excessively hot and that adequate cooling airflow is available.

Specs & values

  • Load 75 to 100 percent of rated capacity
  • Run at least 30 minutes

Full service-parts list: Generac QUIETPACT 55 →, Generac QuietPact 65 →, Generac QuietPact 75 →, Generac QuietPact 75 LP →

Source: Generac owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Generac repair guides →