Generac — Manual Transfer to Standby and Manual Startup
Operation · Transfer switch / generator
From a Generac service manual — check it applies to your exact model before use.
Applies to: Generac GH-410 engine, Generac GT-530 engine, Generac GT-530 engine, Generac GT-990 engine
Procedure
- On the generator panel, set the AUTO-OFF-MANUAL switch to OFF.
- On the generator, set the main line circuit breaker to its OFF or "Open" position.
- Turn OFF the power supply to the transfer switch, using whatever means provided.
- Manually actuate the transfer switch main contacts to their "Standby" position.
- On the generator panel, set the AUTO-OFF-MANUAL switch to MANUAL. The engine should crank and start.
- Let the engine warm up and stabilize for a minute or two at no-load.
- Set the generator main line circuit breaker to its "On" or "Closed" position. The generator now powers the electrical loads.
Tools required
- Manual transfer handle Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Source: Generac service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.