Generac 8.1 GN — Automatic Transfer Operation

Operation · Transfer switch

For the Generac 8.1 GN, from the Generac owner's manual.

Applies to: Generac 8.1 GN, Generac GH-410 engine, Generac GT-530 engine, Generac GT-990 engine, Generac GT-999 engine

Procedure

  1. Make sure the transfer switch main contacts are set to their UTILITY position.
  2. Be sure normal UTILITY voltage is available to transfer switch terminal lugs N1 and N2.
  3. Press the AUTO button on the Control Panel Interface.
  4. Set the Main Circuit Breaker (Generator Disconnect) to its ON (Closed) position.

Specs & values

  • Utility failure: below 65% of nominal
  • Utility restored: above 75% nominal
  • 10 second line interrupt delay
  • 5 second engine warm-up timer
  • 15 seconds utility return delay
  • 1 minute cool-down time

Full service-parts list: Generac 8.1 GN →

Source: Generac owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.