Home›Repair guides›Cummins/Onan›Prestart Preparation

Cummins/Onan — Prestart Preparation

Operation · battery/electrical

From a Cummins/Onan service manual — check it applies to your exact model before use.

Applies to: Cummins/Onan GGHE, Cummins/Onan GGHF, Cummins/Onan V-10 WSG-1068 engine

Before you start

  • Always connect negative battery cable last to prevent arcing

Procedure

  1. Verify all electrical connections are secure and wiring is complete and inspected.
  2. Connect positive battery cable before connecting negative battery cable.
  3. Service the battery as necessary; connect separate battery charger if ATS lacks built-in charge circuit.
  4. Start the generator set and verify all engine and generator gauges display correct values.

Full service-parts list: Cummins/Onan GGHE →, Cummins/Onan GGHF →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →