Home›Repair guides›Cummins/Onan›AC Electrical Connections

Cummins/Onan — AC Electrical Connections

Installation · AC wiring

From a Cummins/Onan service manual — check it applies to your exact model before use.

Applies to: Cummins/Onan GGHE, Cummins/Onan GGHF, Cummins/Onan V-10 WSG-1068 engine

Before you start

  • Do not connect generator set directly to any building electrical system
  • Reconfiguring to different voltages can damage generator or windings; consult distributor

Procedure

  1. Place the control panel run switch in OFF position; remove AC power from battery charger; remove negative battery cable.
  2. Install transfer switch for standby service applications.
  3. Reconfigure generator output leads on connection terminal block per Reconnection Diagram as needed for nameplate voltage.
  4. Bolt stranded load wires to the appropriate U/V/W/N terminals.
  5. Balance loads so current flow from each line terminal is within 10 percent of median value.
  6. Install current transformers (CT21/CT22/CT23) per Reconnection Diagram with dot facing toward the generator.
  7. Ground the genset to earth in one location only.

Specs & values

  • Load current balance within 10% of median value, not exceeding nameplate rating

Full service-parts list: Cummins/Onan GGHE →, Cummins/Onan GGHF →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →