Generac GTV-760 Engine

The Generac GTV-760 is a 0.76 L 2-cylinder engine rated at 2200 rpm. It powers generator sets from Generac, including the QUIETPACT 55, QuietPact 65 and QuietPact 75. It holds 2.2 L (0.6 gal) of oil.

Also known as: Generac GTV-760

0.763 L
Displacement
2
Cylinders
2200 rpm
Rated speed
2.2 L
Oil capacity

Engine specifications

Oil capacity2.2 L
Displacement0.763 L
Cylinders2
Rated speed2200 rpm

Common problems

1
  • ENGINE WILL NOT CRANK 7.5 AMP (F1) FUSE BLOWING

Compiled from service & troubleshooting documentation across every generator set that uses the Generac GTV-760.

Maintenance schedule

ItemSpecCapacityPart #Interval
Air filterAir Primary Donaldson0E3557 Amazon $62.74 eBay $17.44
Fuel filterFuel Filter0F0106 Amazon $34.09 eBay
Oil filterOil Black 75mm Long070185B Amazon $46.62 eBay $26.99
Spark plugSpark Plug0E6037 Amazon eBay

Pooled from every document that names this exact engine — confirm the interval and part number against your unit's serial number.

Service intervals

17
ItemActionHoursMonthsNotes
Engine oil levelCheck8 hrCheck at least every eight hours of operation or before use
Foam PrecleanerClean25 hr3 moEvery three months or every 25 hours, whichever occurs first
Spark ArrestorClean50 hr12 moInspect and clean every 50 hours or once each year, whichever comes first
Air Pre-filterClean100 hrFrom RV Generator Service Interval list
Air pre-filter (foam precleaner)Clean100 hr3 moEvery three months or every 100 hours, whichever occurs first
Engine Oil and Oil FilterChange100 hrFirst service — Every 100 operating hours; more often under heavy load or high ambient temperature
Engine oilChange100 hrFirst service — Change after first 25 hours, then every 100 hours
Oil filterChange100 hrFirst service — Change after first 25 hours, then every 100 hours
Spark PlugClean100 hrClean plug and reset gap every 100 hours
Spark PlugsInspect100 hrRV Generator Service Interval list
Paper air filter elementReplace250 hr
Fuel filterReplace400 hr12 moOnce each year or every 400 hours, whichever comes first (gasoline only)
Spark plugsReplace500 hr
Valve LashAdjust500 hrFirst service — 1st 50 hours, then every 500 hours
BatteryTest6 moEvery six months - check state of charge and condition with hydrometer
Battery state of charge and conditionTest6 moEvery six months with an automotive-type battery hydrometer
Valve clearanceCheck6 moFirst service — After the first six months of operation, adjust if necessary

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Service specifications

37
TypeItemValueUnitCondition
ClearanceExhaust system to combustible material3inch
GapSpark plug gap0.030inch (0.8 mm)
GapSpark plug gap0.040inch
GapSpark plug gap1.02mm
OtherAC voltage regulation115voltsat 60 Hertz AC frequency
OtherCompression ratio8.6 to 1
PressureFuel pump outlet pressure2.0 to 3.5psi
PressureLP fuel system leak test pressure90psi
PressureLP gas pressure at gaseous fuel solenoid valve and secondary regulator inlet11inches water columnoptimum
PressureLP gas pressure at inlet to gaseous fuel solenoid and secondary regulator11inches water column
PressureLP gas pressure to solenoid valve14inches water columndo NOT exceed
PressureLP gas system leak test pressure90psi (620 kPa)not less than, test with soap and water solution
PressureLP primary regulator maximum outlet pressure14inches water columndo not exceed
PressureLow oil pressure switch trip pointbelow 10psiswitch closes below this pressure
ResistanceRotor minimum insulation resistance1.5megohms
ResistanceStator minimum insulation resistance (120 VAC)1.12megohmsper formula (rated volts/1000)+1
SpeedEngine governor speed2200rpm
SpeedEngine governor speed2571rpm
SpeedNo-load frequency62Hzgovernor set point, no electrical load
SpeedRated horsepower27hpat 3600 rpm
SpeedRated rotor speed3600rpm
TemperatureExhaust heat rise limit at combustible material117deg. Fabove ambient air temperature
TemperatureHigh temperature switch actuation (LP models)284deg. F
TemperatureHigh temperature switch actuation (gasoline models)270deg. F
TemperatureHigh temperature switch setting (LP models)284°F (140°C)closes on high temp
TemperatureHigh temperature switch setting (gasoline models)270°F (132°C)closes on high temp
TemperatureValve adjustment engine temperature60 to 80deg. F
TorqueCrankcase breather screws5-8ft-lbs
TorqueGovernor clamp bolt70inch-pounds (8 N-m)
TorqueRocker arm jam nut174inch-pounds
Valve clearanceExhaust Valve0.002-0.004inchengine at room temperature, piston at TDC compression
Valve clearanceIntake Valve0.002-0.004inchengine at room temperature, piston at TDC compression
Valve clearanceValve clearance0.002 - 0.004inchengine cool
Valve clearanceValve clearance0.05 - 0.1mmengine cool
VoltageBattery cable voltage drop0.12volts per 100 amperes of cranking currentmaximum, for best cold weather starting
VoltageGenerator AC output voltage regulation115voltsat 60 Hertz
VoltageNo-Load AC output voltage124VACat 62.5 Hz no-load

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Recommended fluids

FluidGradeStandardAmbientCapacityNotes
Engine oil5W-30 or 5W-20Data decal (SAE VISCOSITY) alternate viscosity
Engine oilSAE 10W-30API classification 'For Service SF'1.8 litersCrankcase capacity 1.8 liters or 1.9 quarts with oil filter change; do not pour in additives
Engine oilSAE 30 or 10W-30Data decal (SAE VISCOSITY); temperature 40°F and higher
Engine oilSAE 30 or SAE 10W-30API SF, SG, SH or SJDuring summer months (40 deg. F and higher). DO NOT USE SAE 10W-40. DO NOT use special additives.
Engine oilSAE 5W-30API classification 'For Service SF'Used to refill crankcase during out-of-service storage
Engine oilSAE 5W-30 or SAE 5W-20API SF, SG, SH or SJDuring winter months (40 deg. F to -20 deg. F)
FuelHigh quality UNLEADED gasolineLeaded REGULAR grade acceptable substitute; alcohol content must not exceed 10 percent ethanol; do NOT use methanol
FuelLP gas (vapor withdrawal only)Recommended minimum gas flow rate for air-cooled generators is 67 cubic feet per hour
FuelUnleaded gasoline (high quality); leaded REGULAR grade is an acceptable substitutemax 10 percent ethanol if alcohol present; DO NOT use methanolRemove alcohol-containing fuel during storage
OtherLP (liquid propane) gasVapor withdrawal type systems only

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Procedures

12
Adjusting Valve Clearance adjustment

⚠ Hold the rocker arm jam nut in place as the pivot ball stud is turned.

⚠ Start all four screws before tightening.

Tools: Feeler gauge, 10mm allen wrench, #2 or #3 Phillips screwdriver, Large socket and socket wrench

  1. Make sure the engine is cool and at 60 deg to 80 deg F.
  2. Remove spark plug wires and position them away from plugs.
  3. Remove spark plugs.
  4. Rotate the engine clockwise with a socket on the flywheel nut to bring the piston to Top Dead Center of its compression stroke.
  5. Remove the four screws attaching the valve cover.
  6. Loosen the rocker jam nut and use a 10 mm allen wrench to turn the pivot ball stud while checking clearance with a feeler gauge.
  7. When clearance is correct, hold the pivot ball stud and tighten the rocker arm jam nut to 174 in/lbs.
  8. Recheck valve clearance after tightening.
  9. Install a new valve cover gasket and re-attach the valve cover.
  10. Install spark plugs and re-attach the spark plug wires.
Check and Adjust Valve Clearance adjustment

Tools: 10mm allen wrench, feeler gauge, crow's foot torque wrench

  1. Adjust valve clearance with engine at room temperature, piston at TDC of compression stroke.
  2. Loosen rocker arm jam nut, use 10mm allen wrench to turn pivot ball stud while checking clearance with feeler gauge.
  3. Set intake valve clearance 0.002-0.004 in and exhaust valve clearance 0.002-0.004 in.
  4. Hold pivot ball stud with allen wrench and tighten rocker arm jam nut to 174 inch-pounds with a crow's foot.
  5. Recheck valve clearance after tightening jam nut.
  6. Install rocker arm cover with new gasket and retain with four screws.
Governor Adjustment adjustment

Tools: Pliers

  1. Loosen governor clamp bolt.
  2. Push spring end of governor lever clockwise to wide open throttle position.
  3. Hold governor lever at wide open throttle and rotate governor shaft fully clockwise with pliers.
  4. Tighten governor clamp bolt to 70 inch-pounds (8 N-m) while holding shaft and lever.
  5. Start engine, let stabilize and warm up at no-load.
  6. Turn adjuster nut to obtain 62 Hertz frequency reading.
  7. Reposition governor spring in lever slot if droop is excessive or for greater stability.
  8. Recheck frequency and readjust adjuster nut to obtain 62 Hertz at no-load.
  9. Check AC voltage reading; adjust voltage regulator if incorrect.
Voltage Regulator Adjustment adjustment

⚠ Adjustment must be done only when unit is running at correct governed no-load speed

  1. Run unit at no-load with frequency set to 62.5 Hz.
  2. Slowly turn voltage adjust pot on voltage regulator until 124 VAC is measured.
  3. If voltage is not adjustable, proceed to troubleshooting Problem 2.
Stator Short-to-Ground Insulation Test diagnostic

⚠ Insulation resistance testers are a source of high and dangerous electrical voltage

Tools: Hi-pot tester or megohmmeter

  1. Disconnect and isolate all stator leads including sensing, excitation, battery charge and power leads.
  2. Connect terminal ends of all stator leads together.
  3. Connect tester leads across all stator leads and to frame ground on stator can, apply 1500 volts for no more than 1 second.
  4. If breakdown indicated, clean and dry stator and re-test; replace stator if it fails second test.
Battery Cable Connections installation

⚠ Damage will result if the battery connections are made in reverse.

  1. Connect the battery cable from the POSITIVE (POS or +) post to the lug on the starter contactor.
  2. Check that the battery cable boot for the starter cable has been installed.
  3. Connect the battery cable from the NEGATIVE (NEG or -) post to the frame ground connection.
  4. Connect cables so the connectors are clean and tight.
LP Gas System Leakage Test installation

⚠ DO NOT USE ANY FLAME TO TEST FOR LEAKS.

Tools: soap and water solution, separate 12 volt DC source

  1. Do not place the generator into service until the gas system has been properly tested for leaks.
  2. Provide a separate source of 12 volts DC to open the gaseous fuel solenoid valve.
  3. Test all connections, hoses, valve regulators and fittings under gas or air pressure of not less than 90 psi (620 kPa).
  4. Use soap and water or an equivalent solution to check for leaks.
Testing Under Load (Post Installation) installation

⚠ You must not allow the unit to overheat during prolonged operation.

  1. Apply electrical loads equal to about 75 to 100 percent of the unit's rated wattage/amperage capacity.
  2. Let the unit run at least 30 minutes with load applied.
  3. Check that the unit is not running excessively hot and that adequate cooling airflow is available.
Changing the Engine Oil and/or Oil Filter maintenance

⚠ DO NOT FILL ABOVE THE 'FULL' MARK.

Tools: suitable container for oil, clean lint-free cloth

  1. Run the engine until thoroughly warmed up (at least five minutes), then shut OFF the engine.
  2. With the engine still warm, remove the oil drain plug and drain oil into a suitable container.
  3. After the oil has drained, replace the oil drain plug (if only changing oil, go to step 7).
  4. Remove the old oil filter by turning it counterclockwise.
  5. Apply a light coating of clean engine oil to the gasket of the new filter.
  6. Screw the new filter on by hand until its gasket lightly contacts the oil filter adapter; tighten an additional 3/4 to one turn.
  7. Remove the dipstick and fill crankcase with proper oil; capacity about 1.8 liters or 1.9 quarts with filter change.
  8. Install and tighten the dipstick before operating the engine.
  9. Start the engine and check for leaks.
Check/Install Crankcase Breather maintenance
  1. Disconnect breather tube and remove four screws and breather; discard gasket.
  2. Check that reed valve is not deformed and forms complete seal around vent hole.
  3. Remove oil vapor collector and retainer; check collector for deterioration, replace if necessary.
  4. Install oil vapor collector and retainer, pushed in until it bottoms.
  5. Install breather with new gasket, torque screws to 5-8 ft-lbs.
  6. Assemble breather tube to intake elbow.
Checking the Engine Oil Level maintenance

⚠ Never operate the engine with the oil level below the 'Add' mark.

⚠ DO NOT FILL ABOVE THE 'FULL' MARK.

Tools: clean lint-free cloth

  1. Be sure the generator is as level as possible.
  2. Remove the dipstick and wipe it dry with a clean, lint-free cloth.
  3. Install and tighten the dipstick cap, then remove it again; oil should be at 'Full' mark.
  4. If necessary, remove oil fill cap on rocker cover and slowly add oil to the 'Full' mark.
  5. Install and tighten the oil fill cap and the dipstick before operating the engine.
Checking the Engine Spark Plug maintenance

⚠ Do not blast the spark plug to clean.

Tools: wire brush, commercial solvent, wire feeler gauge

  1. Clean the area around the base of the spark plug to keep dirt and debris out of the engine.
  2. Remove the spark plug and check its condition; replace if worn or if reuse is questionable.
  3. Check the spark plug gap with a wire feeler gauge and adjust to 0.030 inch (0.76 mm) by carefully bending the ground electrode.

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Voltage reconnection

VoltagePhaseConnectionLeadsNotes
1201120 VAC loads only - line to neutralT1 (Red) and T3 (Black) hot; T2 (White) grounded neutral; green ground wireOne load with a maximum total wattage requirement equal to the generator's rated power output, with 120V across the generator output terminals
1201Line T1 (Red) to T2 (White) via circuit breaker CB1T1 (Red), T2 (White)120V single-phase 60 Hz loads
1201Line T3 (Black) to T2 (White) via circuit breaker CB2T3 (Black), T2 (White)120V single-phase 60 Hz loads; total unit load must not exceed maximum generator rating
120single phase120 VAC loads only - one load with maximum total wattage equal to the generator's rated power output; 120V across the generator output terminalsT1 (red), T2 (white), T3 (black), green ground; grounded neutralFigure 1.1/5.1 - Connection for 120 Volts Only
120 VAC only1-PhaseSingle load, 120V across output terminals11P/22P, 33/44Max wattage equal to rated output
120/2401120/240 VAC loads - dual voltage outputT1 (Red), T2 (White), T3 (Black) plus green ground wireOne 240V load at rated output, OR two separate 120V loads each at half rated output. Loads across T1-T2 and T3-T2 must not exceed ratings. Unit is reconnectable to 120 and/or 240 volts; not RVIA/ANSI listed when reconnected for dual voltage.
120/240single phase120/240 VAC loads - one load with maximum total wattage equal to rated output at 240V; or two separate loads each up to half rated output at 120VT1 (red), T3 (black) are 'hot'; T2 (white) is the grounded neutral; green lead connects to groundFigure 1.2/5.3 - Connection for 120/240 Volts; units not listed per RVIA/ANSI when reconnected for dual voltage output
120/240 VAC1-PhaseDual voltage output, two hot leads T1(11P/44 red) T3(33 black), neutral T2 (22P/33 white)11P, 22P, 33, 44No longer RVIA listed if reconnected for dual voltage

Extracted from the manufacturer documentation linked to this model. Values are copied as printed; confirm against your unit's manual and serial number.

Aftermarket parts that fit this engine

2

Parts listed by aftermarket suppliers as fitting this engine — leads compiled from supplier catalogs; verify the exact part for your serial number.

Common questions

What is the oil capacity of the Generac GTV-760?

The Generac GTV-760 engine has an oil capacity of 2.2 liters.

What is the displacement of the Generac GTV-760?

The Generac GTV-760 has a displacement of 0.763 liters with 2 cylinders.

Which generators use the Generac GTV-760 engine?

The Generac GTV-760 powers 3 generator set(s), including Generac QUIETPACT 55, Generac QuietPact 65, Generac QuietPact 75.

What is a common problem with the Generac GTV-760 engine?

A commonly reported issue on generators using the Generac GTV-760 is: ENGINE WILL NOT CRANK.