Home›Repair guides›MTU›Charge-air coolant – Filling

MTU — Charge-air coolant – Filling

Maintenance · Coolant circuit (LT)

From a MTU operator's manual covering: 20 V 4000 G23, 20 V 4000 G43, 20 V 4000 G63, 20 V 4000 G83, 20V 4000 G63L, 20V 4000 G83L. Check it applies to your exact model before use.

Applies to: MTU 20 V 4000 G83, MTU 20 V 4000 G23 engine, MTU 20 V 4000 G43 engine, MTU 20 V 4000 G63 engine, MTU 20V 4000 G63L engine, MTU 20V 4000 G83 engine, MTU 20V 4000 G83L engine

Before you start

  • Coolant is hot and under pressure.
  • Fill/top up coolant only into cold engine.

Procedure

  1. Turn breather valve counterclockwise to first stop and remove.
  2. Connect pump to drain valve; open and pump coolant at 0.5 bar minimum.
  3. Fill expansion tank until overflow edge reached.
  4. Close drain valve and fit breather valve.
  5. Start engine, run unloaded 10 seconds, stop engine.
  6. Check coolant level and top up if required; repeat as necessary.

Specs & values

  • Fill coolant at 0.5 bar minimum

Source: MTU operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More MTU repair guides →