Home›Repair guides›Kohler›Resetting Procedure - Fault Shutdown (Relay Controller)

Kohler — Resetting Procedure - Fault Shutdown (Relay Controller)

Maintenance

From a Kohler service manual covering: 10RFOY, 10ROY, 15RFOY, 15ROY, 6RFOY, 6ROY. Check it applies to your exact model before use.

Applies to: Kohler 10RFOY, Kohler 10ROY, Kohler 15RFOY, Kohler 15ROY, Kohler 6RFOY, Kohler 6ROY, Yanmar 3TN75E-RK engine, Yanmar 4TN84E-RK engine

Before you start

  • See Safety Precautions before proceeding.

Procedure

  1. Move generator master switch to OFF/RESET until fault lamp goes out.
  2. Disconnect generator set from load with line circuit breaker or transfer switch.
  3. Correct cause of fault shutdown.
  4. Move generator master switch to normal position (RUN or AUTO) for start-up.

Full service-parts list: Kohler 10RFOY →, Kohler 10ROY →, Kohler 15RFOY →, Kohler 15ROY →, Kohler 6RFOY →, Kohler 6ROY →, Yanmar 3TN75E-RK engine →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →