Home›Repair guides›Kohler›Prepare the Site, Indoor Installations, Open Units

Kohler — Prepare the Site, Indoor Installations, Open Units

Installation · generator set site

From a Kohler service manual covering: 10REOZD, 15REOZD, 20REOZD. Check it applies to your exact model before use.

Applies to: Kohler 10REOZD, Kohler 15REOZD, Kohler 20REOZD

Procedure

  1. Clear all combustible materials from the generator set location.
  2. Lay a concrete pad that extends at least 152 mm (6 in.) beyond the generator set on all sides.
  3. Include mounting bolts at the locations shown on the dimension drawing.
  4. Provide air intake and outlet openings as described in Section 5.1.

Specs & values

  • Maintain a minimum of 457 mm (18 in.) between the generator set and any adjacent walls or obstructions

Full service-parts list: Kohler 10REOZD →, Kohler 15REOZD →, Kohler 20REOZD →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →