Kohler — Prepare the Site, Indoor Installations, Open Units
Installation · generator set site
From a Kohler service manual covering: 10REOZD, 15REOZD, 20REOZD. Check it applies to your exact model before use.
Applies to: Kohler 10REOZD, Kohler 15REOZD, Kohler 20REOZD
Procedure
- Clear all combustible materials from the generator set location.
- Lay a concrete pad that extends at least 152 mm (6 in.) beyond the generator set on all sides.
- Include mounting bolts at the locations shown on the dimension drawing.
- Provide air intake and outlet openings as described in Section 5.1.
Specs & values
- Maintain a minimum of 457 mm (18 in.) between the generator set and any adjacent walls or obstructions
Full service-parts list: Kohler 10REOZD →, Kohler 15REOZD →, Kohler 20REOZD →
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.