Home›Repair guides›Generac›Testing the Battery Charge Circuit

Generac — Testing the Battery Charge Circuit

Testing & diagnosis

From a Generac service manual covering: GN-190, GN-220, NP-30G, NP-40G. Check it applies to your exact model before use.

Applies to: Generac NP-30G, Generac GN-190 / GN-220 engine, Generac GN-220 engine

Procedure

  1. Disconnect Wire 77 at the Battery Charge Rectifier (BCR).
  2. Disconnect Stator output Wire 66 at the BCR.
  3. Disconnect Wire 55.
  4. Set a VOM to Rx1 and zero the meter.
  5. Connect the VOM test leads across Wires 77 and 55, then across Wires 66 and 55; note both resistance readings.
  6. With the unit running, measure AC voltage at the Wires 66 and 77 terminals; if no AC voltage, an open circuit exists in Wire 66 or 77.
  7. With engine running, check for DC voltage between the BCR Wire 55 and frame ground; if AC was present but DC is not, the BCR is defective.

Tools required

  • VOM (volt-ohm-milliammeter) Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Battery charge winding resistance across Wires 66 to 55 = 0.037-0.042 ohm
  • Across Wires 77 to 55 = 0.037-0.042 ohm

Full service-parts list: Generac NP-30G →

Source: Generac service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Generac repair guides →