Home›Repair guides›Generac›Preparing Unit for Towing

Generac MDE330 — Preparing Unit for Towing

Operation · Trailer

For the Generac MDE330, from the Generac owner's manual.

Applies to: Generac MDE330, Perkins 1706J-E93TAG2 engine

Before you start

  • Tighten wheel lug nuts after first 50 miles to factory specifications.

Procedure

  1. Verify engine is OFF.
  2. Use the tongue jack to raise or lower the trailer onto the hitch.
  3. Lock the hitch coupling and attach the safety chains or cables.
  4. Raise the tongue jack to the highest position.
  5. Lubricate grease fittings on leveling jacks.
  6. Connect trailer wiring harness; verify directional and brake lights.
  7. Verify all doors and hoods are properly latched.
  8. Verify all tires are inflated to the correct pressure.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Max tire pressure 125 psi (862 kPa)

Full service-parts list: Generac MDE330 →

Source: Generac owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Generac repair guides →