Home›Repair guides›Fischer Panda›Check and discharge the capacitors

Fischer Panda — Check and discharge the capacitors

Maintenance

From a Fischer Panda owner's manual covering: Panda 4K PMS, Panda 5K PMS, Panda 7K PMS. Check it applies to your exact model before use.

Applies to: Fischer Panda Panda 4K PMS, Fischer Panda Panda 5K PMS

Before you start

  • Charged capacitors can be lethal; do not touch bare contacts.

Procedure

  1. Never check capacitors while generator motor is running.
  2. Disconnect terminal lead wires using insulated pliers or screwdriver.
  3. Discharge capacitors by bridging terminals with discharge reactor.
  4. For three-phase capacitors discharge between every phase.
  5. Measure capacity with multimeter set to capacitor measuring.

Tools required

  • Multimeter with capacitor measuring Amazon
  • Discharge reactor 5-10 kOhm Amazon
  • Insulated pliers/screwdriver Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Discharge reactor 5-10 kOhm

Full service-parts list: Fischer Panda Panda 4K PMS →, Fischer Panda Panda 5K PMS →

Source: Fischer Panda owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Fischer Panda repair guides →