Home›Repair guides›Cummins/Onan›Preparing to Mount the EC-30

Cummins/Onan — Preparing to Mount the EC-30

Installation · EC-30 controller

From a Cummins/Onan service manual — check it applies to your exact model before use.

Applies to: Cummins/Onan HDKA, Cummins/Onan HDKB, Cummins/Onan HDKC

Before you start

  • CAUTION! Check the backside (inside) of the chosen location before drilling or cutting.

Procedure

  1. Select a visible location where the EC-30 can be easily operated.
  2. Check the backside of the chosen location to verify nothing will interfere with drilling, cutting, fasteners, harness plug or enclosure.
  3. Determine feasibility of routing control wires from the genset to the remote; verify routing meets national and local codes.
  4. Wires must be protected from all hot, sharp, and abrasive surfaces.
  5. Cut out the mounting template and tape it square or level to the mounting surface.
  6. Use a center punch and hammer to punch marks for each fastener and at the cutout perimeter.
  7. Remove the template. Drill cutout starter holes at the four corners, cut between them and remove the cutout.
  8. Drill 1/8-inch diameter holes for the control panel fastening screws.
  9. Do not mount until wiring is complete.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 1/8 inch mounting holes when using #6 wood screws
  • 5/32 inch mounting hole for #6 machine screws
  • Cutout area 3.25 in x 5.1875 in per mounting footprint

Full service-parts list: Cummins/Onan HDKA →, Cummins/Onan HDKB →, Cummins/Onan HDKC →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →