Cummins/Onan Energy Command 20 — Final Connections and Testing
Installation · EC-20 controller
For the Cummins/Onan Energy Command 20, from the Cummins/Onan service manual.
Applies to: Cummins/Onan HDKA, Cummins/Onan HDKB, Cummins/Onan HDKC
Before you start
- DO NOT OVER-TIGHTEN MOUNTING SCREWS, IT MAY DAMAGE OR DISTORT THE ENCLOSURE.
Procedure
- Plug the genset end of the connector into the genset.
- Pass the controller end of the harness through the cutout for the controller.
- Plug the controller end of the harness into the controller.
- Insert the controller in the cutout hole and secure it with the supplied screws (do not over-tighten).
- Install the magnetic overlay.
Tools required
- Screws supplied with the controller Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Full service-parts list: Cummins/Onan HDKA →, Cummins/Onan HDKB →, Cummins/Onan HDKC →
Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.