Home›Repair guides›Cummins/Onan›Control wiring connections

Cummins/Onan — Control wiring connections

Installation · Diesel fuel tank control

From a Cummins/Onan service manual covering: 4A2.3, 6A3.4-GS, 6AT3.4-GS, DL4, DL6, QSA3, QSA4, QSA6. Check it applies to your exact model before use.

Applies to: Cummins/Onan DGAB, Cummins/Onan DGAC, Cummins/Onan DGAD, Cummins/Onan DGAE, Cummins/Onan DL4, Cummins/Onan DL6

Procedure

  1. Remove control cover for access to wiring terminals.
  2. Connect float switch wiring harness plug to receptacle J5 on PCB.
  3. Connect five leads of pump wiring harness to appropriate terminals on control PCB.
  4. Connect 120 VAC or 240 VAC power supply to appropriate control terminals; factory setup is 240 VAC.
  5. For 120 VAC, remove jumpers TB1-6 to TB1-7; install jumpers TB1-5 to TB1-6 and TB1-7 to TB1-8; move S103 to up position.
  6. Use two-lead wire harness to connect TB1-19 to positive starter solenoid terminal and TB1-20 to negative terminal.
  7. Connect TB1-14 and TB1-15 to shut down engine under low fuel conditions.
  8. Terminals TB1-10 through TB1-17 and TB2-23 through TB2-27 are available for remote annunciators.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Factory power connection is 240 VAC; selector switch S103 down for 240 V and up for 120 V.

Full service-parts list: Cummins/Onan DGAB →, Cummins/Onan DGAC →, Cummins/Onan DGAD →, Cummins/Onan DGAE →, Cummins/Onan DL6 →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →