Atlas Copco — Starting Qc1001 locally

Operation · Qc1001 control panel

From a Atlas Copco operator's manual covering: 1103A-33TG1, 1103A-33TG2, QAS 30 Pd, QAS 45 Pd, QAS 60 Pd, Qc1001, Qc3001. Check it applies to your exact model before use.

Applies to: Perkins 1103A-33TG1, Perkins 1103A-33TG2, Perkins 1103A-33G2 (QAS 30 Pd); 1103A-33TG1 (QAS 45 Pd); 1103A-33TG2 (QAS 60 Pd) engine

Procedure

  1. Switch on the battery switch.
  2. Switch off circuit breaker Q1 (not needed when a plant contactor is installed between Q1 and the load).
  3. Put the starter switch in start position; the unit starts a preheating cycle which takes 12 seconds.
  4. After the preheating period the unit will start; the starting attempt takes maximum 12 seconds.
  5. Switch on circuit breaker Q1 in case no contactor is installed.

Specs & values

  • Preheating cycle 12 seconds
  • Starting attempt maximum 12 seconds

Full service-parts list: Perkins 1103A-33TG1 →, Perkins 1103A-33TG2 →, Perkins 1103A-33G2 (QAS 30 Pd); 1103A-33TG1 (QAS 45 Pd); 1103A-33TG2 (QAS 60 Pd) engine →

Source: Atlas Copco operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.