Home›Repair guides›Atlas Copco›Preparing for operation after storage

Atlas Copco — Preparing for operation after storage

Maintenance · Generator

From a Atlas Copco operator's manual covering: 1103A-33TG1, 1103A-33TG2, QAS 30 Pd, QAS 45 Pd, QAS 60 Pd, Qc1001, Qc3001. Check it applies to your exact model before use.

Applies to: Perkins 1103A-33TG1, Perkins 1103A-33TG2, Perkins 1103A-33G2 (QAS 30 Pd); 1103A-33TG1 (QAS 45 Pd); 1103A-33TG2 (QAS 60 Pd) engine

Procedure

  1. Remove the wrapping, VCI paper and silica gel bags and check the generator thoroughly using the 'Before starting' checklist.
  2. Check that the insulation resistance of the generator exceeds 5 MΩ.
  3. Replace the fuel filter and fill the fuel tank; vent the fuel system.
  4. Reinstall and connect the battery, if necessary after being recharged.
  5. Submit the generator to a test run.

Specs & values

  • Insulation resistance exceeds 5 MΩ

Full service-parts list: Perkins 1103A-33TG1 →, Perkins 1103A-33TG2 →, Perkins 1103A-33G2 (QAS 30 Pd); 1103A-33TG1 (QAS 45 Pd); 1103A-33TG2 (QAS 60 Pd) engine →

Source: Atlas Copco operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Atlas Copco repair guides →