Home›Repair guides›Wacker Neuson›Testing the Breakaway System (Electric Brakes)

Wacker Neuson G 25 — Testing the Breakaway System (Electric Brakes)

Maintenance · Trailer breakaway system

For the Wacker Neuson G 25, from the Wacker Neuson owner's manual.

Applies to: Wacker Neuson G 25

Before you start

  • Disconnect trailer wiring plug before testing; damage to electronic brake control.

Procedure

  1. Connect machine/trailer to tow vehicle.
  2. Disconnect trailer wiring plug from tow vehicle.
  3. Pull breakaway pin out of brake switch and tow at less than 5 mph.
  4. Stop the tow vehicle.
  5. Check breakaway battery voltage; replace or recharge if not 12–14 VDC.
  6. Repair wiring/mechanical faults if brakes did not function.
  7. Reconnect wires, re-install cover and breakaway pin, reconnect plug.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 12–14 VDC breakaway battery

Source: Wacker Neuson owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Wacker Neuson repair guides →