Wacker Neuson G 25 — Filling the Radiator

Maintenance

For the Wacker Neuson G 25, from the Wacker Neuson owner's manual.

Applies to: Wacker Neuson G 25

Before you start

  • Burn hazard. Check coolant level only after engine is shut down and cool.

Procedure

  1. Open the access cover on the roof.
  2. Slowly rotate radiator cap counterclockwise to release pressure; remove.
  3. Add coolant at about 1.5 gallons per minute for 6 minutes.
  4. Wait 10 minutes, then fill at about 1.5 gallons per minute for 3:30 minutes or until full.
  5. Run machine under 50% load for about 15 minutes until coolant exceeds 190°F.
  6. Inspect radiator cap and seal; clean or replace if necessary.
  7. Re-install the radiator cap.

Specs & values

  • 50% load
  • coolant temperature exceeds 190°F

Source: Wacker Neuson owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.