Wacker Neuson G 25 — Filling the Radiator
Maintenance
For the Wacker Neuson G 25, from the Wacker Neuson owner's manual.
Applies to: Wacker Neuson G 25
Before you start
- Burn hazard. Check coolant level only after engine is shut down and cool.
Procedure
- Open the access cover on the roof.
- Slowly rotate radiator cap counterclockwise to release pressure; remove.
- Add coolant at about 1.5 gallons per minute for 6 minutes.
- Wait 10 minutes, then fill at about 1.5 gallons per minute for 3:30 minutes or until full.
- Run machine under 50% load for about 15 minutes until coolant exceeds 190°F.
- Inspect radiator cap and seal; clean or replace if necessary.
- Re-install the radiator cap.
Specs & values
- 50% load
- coolant temperature exceeds 190°F
Source: Wacker Neuson owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.