Power Solutions International 10L Turbo — Assembly steps of signal generator
Repair & overhaul · Ignition system
For the Power Solutions International 10L Turbo, from the Power Solutions International service manual.
Applies to: Power Solutions International 10L & 10L Turbo engine
Procedure
- Assemble timing gear onto signal generator, fasten with M22 hexagon bolts
- Assemble O-ring into the signal generator
- Assemble speed sensor into signal generator, fasten with M6 hexagon bolts
- Screw double-headed stud into timing gear housing, assemble signal generator, fasten with M10 bolt
- Adjust crankshaft to TDC (1# cylinder compression stroke), tighten connecting bolts between pump gear and signal generator
- Assemble cover, fasten with M6 hexagon bolt
Specs & values
- M22 hexagon bolts: (290-310) Nm
- M6 speed sensor bolts: (8-10) Nm
- M10 bolt: (39-46) Nm
- M6 cover bolt: (8-10) Nm
Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.