Home›Repair guides›Power Solutions International›Assembly steps of piston & connecting rod group

Power Solutions International 10L Turbo — Assembly steps of piston & connecting rod group

Repair & overhaul · Crank-connecting rod mechanism

For the Power Solutions International 10L Turbo, from the Power Solutions International service manual.

Applies to: Power Solutions International 10L & 10L Turbo engine

Before you start

  • Mark pistons G1-G5 by weight; pistons of same weight group must not be misinstalled

Procedure

  1. Install one circlip into piston circlip groove
  2. Insert connecting rod small end, align with piston pin hole, install piston pin and other circlip
  3. Install oil ring, 2nd gas ring and 1st gas ring with TOP upwards
  4. Wipe cylinder inner wall and apply clean lubricating oil
  5. Adjust ring opening positions
  6. Install No.1 and No.6 piston assemblies at BDC
  7. Tighten connecting rod bolts: pretighten, 120 Nm, then 90°±5° to 170Nm~250Nm

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Connecting rod bolts: 120 Nm then 90°±5° to 170Nm~250 Nm
  • 1st ring opening 30° from piston pin centerline; 2nd ring 120° from 1st; oil ring 120° from both

Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →