Home›Repair guides›Northern Lights›Zinc Electrode Service (SP-18)

Northern Lights — Zinc Electrode Service (SP-18)

Maintenance · Heat exchanger zinc electrodes

From a Northern Lights operator's manual covering: M40C3, M944, OM944T3. Check it applies to your exact model before use.

Applies to: Northern Lights M40C3, Northern Lights M944

Before you start

  • Do not use thread sealant on the zinc holders.

Procedure

  1. Check zinc electrode every 250 hours; more often in warm saltwater or where electrolysis is a problem.
  2. Remove the zinc holder from the bottom of the exchanger to drain raw water.
  3. Scrape or steel brush the electrode clean; replace if more than 50% is corroded away.
  4. Reinstall zinc holders with clean threads for good metal-to-metal contact.
  5. Refill the cooling system, start engine and check for leaks.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Full service-parts list: Northern Lights M40C3 →, Northern Lights M944 →

Source: Northern Lights operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Northern Lights repair guides →