Northern Lights NL673 — Starting
Operation · engine
For the Northern Lights NL673, from the Northern Lights operator's manual.
Applies to: Northern Lights NL673
Procedure
- Hold Shutdown Bypass-Preheat switch ON 10 to 20 seconds for cold engine.
- Do not hold too long; can burn out glow plugs.
- While holding preheat switch, push Engine Control switch to START.
- Release both switches as soon as engine starts.
- Do not crank starter more than 10 seconds consecutively.
- If engine fails to start, wait at least 30 seconds before re-engaging.
Specs & values
- 10 to 20 seconds preheat
- stationary at least 30 seconds before re-engaging
Full service-parts list: Northern Lights NL673 →
Source: Northern Lights operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.