Home›Repair guides›Kohler›Contactor Replacement Procedure (Three-Phase)

Kohler TP-6808 — Contactor Replacement Procedure (Three-Phase)

Repair & overhaul · contactor assembly

For the Kohler TP-6808, from the Kohler service manual.

Browse Kohler generators & specs →

Before you start

  • Disconnect all power sources before opening the enclosure.

Procedure

  1. Disable all connected generator sets; disconnect normal and emergency power.
  2. Open the enclosure; check for zero volts on normal and emergency lugs.
  3. Remove tie wraps; disconnect contactor harness from interface board harness.
  4. Disconnect engine start leads and power cables, marking each cable.
  5. Remove four nuts securing the power panel; remove the contactor.
  6. Install new contactor onto the studs; fasten with flat washers, lock washers, nuts.
  7. Torque the nuts to 7.3 Nm (65 in. lb.).
  8. Connect load, normal, emergency cables; tighten bolts to 16.3 Nm (12 ft. lb.).

Tools required

  • basic electrician's hand tools
  • multimeter Amazon
  • tie wraps Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Nuts 7.3 Nm (65 in. lb.)
  • Connecting bolts 16.3 Nm (12 ft. lb.)

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →