Home›Repair guides›Kohler›Contactor Assembly Removal and Installation (Single-Phase)

Kohler TP-6808 — Contactor Assembly Removal and Installation (Single-Phase)

Repair & overhaul

For the Kohler TP-6808, from the Kohler service manual.

Browse Kohler generators & specs →

Before you start

  • Disconnect all power sources before opening the enclosure.

Procedure

  1. Disable the generator set and disconnect all power sources.
  2. Loosen power terminal lugs; disconnect normal, emergency, and load conductors.
  3. Disconnect the contactor wiring harness from the controller at connector P13.
  4. Support contactor; remove screws at corners of the contactor base.
  5. Lift and pull the contactor assembly from the enclosure.
  6. Installation: align mounting holes and reinstall mounting screws.
  7. Tighten screws to torques: 100/150/200 Amp 2.4 Nm, 300/400 Amp 6.8 Nm.
  8. Reconnect conductors and harness; tighten to the specified torques.

Tools required

  • basic hand tools

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 100 Amp 2.4 Nm (21 in. lb.)
  • 150/200 Amp 2.4 Nm (21 in. lb.)
  • 300/400 Amp 6.8 Nm (60 in. lb.)

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →