Kohler — Procedure to Run the Test Sequence

Operation · Transfer switch controller

From a Kohler service manual — check it applies to your exact model before use.

Applies to: Kohler RDT

Before you start

  • Hazardous voltage. Only authorized personnel should open the enclosure.
  • Install front panel(s) or close and lock enclosure door before test.

Procedure

  1. Check LEDs: Utility Source Available and Utility Source Position indicators lit.
  2. Verify generator set master switch is in AUTO position.
  3. Loaded test: hold TEST button 6 seconds. Unloaded test: hold 3 to 5 seconds.
  4. Verify generator set engine starts and GEN Available LED flashes.
  5. For loaded test, verify transfer to emergency; Utility Position LED off, GEN Position LED lights.
  6. Hold Test button 2 seconds to end test.
  7. Verify retransfer to normal source; Utility Position LED lights.
  8. After engine cooldown time delay, generator set shuts down.

Specs & values

  • Engine Start time delay factory setting 3 sec.
  • Transfer from Normal to Emergency 3 sec.
  • Retransfer from Emergency to Normal 6 min.
  • Engine Cooldown 5 min.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.