Home›Repair guides›Kohler›Manual Operation Procedure 2

Kohler — Manual Operation Procedure 2

Operation · Transfer switch contactor (100-200 amp 3-phase, 400 amp 3-phase)

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Never use the maintenance handle to transfer the load with the power connected. Disconnect both power sources before manually operating the switch.

Procedure

  1. If equipped with a maintenance handle, remove the handle from its storage location inside the enclosure.
  2. Insert the maintenance handle or a tool into the hole in the shaft on the left side of the operator.
  3. Move the maintenance handle (or tool) up or down to manually operate the transfer switch; it should operate smoothly without binding.
  4. Return the transfer switch to the Normal position.
  5. Remove the maintenance handle and return it to the storage location.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →