Home›Repair guides›Kohler›Generator Reconnection (12-Lead Three-Phase)

Kohler — Generator Reconnection (12-Lead Three-Phase)

Installation · Stator/alternator leads

From a Kohler service manual covering: 14/20RCA/RCAL, 14RCA, 20RCA, 26RCA, 26RCA/RCAL. Check it applies to your exact model before use.

Applies to: Kohler 14RCA, Kohler 20RCA, Kohler 26RCA, Kohler CH740 / CH1000 / CH1006 engine

Before you start

  • Do not change frequency (60 Hz to 50 Hz) in the field.

Procedure

  1. Press OFF on RDC2 controller.
  2. Disconnect engine starting battery, negative lead first.
  3. Disconnect utility power to generator set.
  4. Remove circuit breaker cover and controller panel for alternator leads and CTs.
  5. Replace circuit breaker with correct part for new voltage rating.
  6. Select desired voltage connection and connect leads per diagram.
  7. Reconnect starting battery, negative lead last.
  8. Check system voltage, frequency, phase settings in Controller Setup.

Tools required

  • Digital multimeter (DVM) Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

Full service-parts list: Kohler 14RCA →, Kohler 20RCA →, Kohler 26RCA →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →