HomeRepair guidesProcedure (Steps: 76)

Kohler RXT — Procedure (Steps: 76)

For the Kohler RXT.

Applies to: Kohler Rxt

Before you start

  • Selected

Procedure

  1. LED status indicator panel (optional)
  2. Contactor assembly
  3. Load shed kit (optional)
  4. Equipment ground
  5. Neutral
  6. Standard controller interface board
  7. Optional combined interface/load management board ADV-8190 GM78647 1 2 4 5 6 3 ADV-8688 7 1 2 ADV-8688 2 5 4 Original Design: Later Design: Figure 1-4 100/200 Amp Model without Load Center, Single-Phase Components TP-6808 12/18 15 Section 1 Specifications and Service Views ADV-8197 GM79354
  8. LED status indicator panel (optional)
  9. Contactor assembly
  10. Equipment ground

Tools required

  • hone

Source: manual:50adb3b2-603c-4040-9f0d-b6f22f56a9fd.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.