Home›Repair guides›Kohler›Controller Operation Test

Kohler — Controller Operation Test

Testing & diagnosis · ATS controller

From a Kohler service manual — check it applies to your exact model before use.

Applies to: Kohler RDT

Before you start

  • Do not manually operate the transfer switch with the power connected.

Procedure

  1. Move generator set master switch to OFF.
  2. Disconnect ALL power sources to the transfer switch.
  3. Manually operate the transfer switch to the normal position.
  4. Close and secure the enclosure door.
  5. Apply normal power source; verify Utility Available LED lights.
  6. Move generator master switch to AUTO; disconnect normal source and verify engine-start contact closes.
  7. Reconnect emergency source; verify GEN LED lights and transfer within time delay.
  8. Reconnect normal source; verify retransfer and engine cooldown.

Specs & values

  • Engine start 3 sec.
  • Transfer Normal to Emergency 3 sec.
  • Retransfer Emergency to Normal 6 min.
  • Engine cooldown 5 min.
  • Contact must operate within +/-10% of time delay setting

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →