Home›Repair guides›Kohler›Controller Circuit Board Replacement Procedure

Kohler — Controller Circuit Board Replacement Procedure

Repair & overhaul

From a Kohler service manual — check it applies to your exact model before use.

Applies to: Kohler RDT

Before you start

  • Electrostatic discharge damage. Wear an approved grounding wrist strap.
  • Hazardous voltage. Disconnect all power sources before opening the enclosure.

Procedure

  1. Press OFF on the generator set controller.
  2. Disconnect the generator set engine starting battery, negative lead first.
  3. Disconnect power to the transfer switch; wait at least 25 minutes for the power supply to discharge.
  4. Open the enclosure and check voltage at source connections to verify power is off.
  5. Disconnect the accessory board connections (P9, RJ45) if equipped and remove the accessory board.
  6. Disconnect all connections to the controller circuit board (P1, P2, P4, P7).
  7. Pull the circuit board off the five standoffs and place the new board onto the bracket.
  8. Reconnect all connectors, reinstall the accessory board, replace the enclosure door, reconnect power, and press AUTO.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Wait at least 25 minutes for power supply discharge

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →