Home›Repair guides›Kohler›Contactor Assembly Installation (Single-Phase Models)

Kohler — Contactor Assembly Installation (Single-Phase Models)

Repair & overhaul

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Procedure

  1. Align the contactor assembly mounting holes with the mounting holes in the enclosure.
  2. Reinstall the screws that secure the contactor assembly and tighten to the torques shown in Figure 7-6.
  3. Reconnect the power source and load conductors to the lugs and tighten to the torques in Section 3.2.2.
  4. Reconnect the contactor wiring harness to the controller at connector P1.

Tools required

  • Basic electrician's hand tools
  • Torque wrench Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Contactor mounting screw torque: 100 Amp 2.4 Nm (21 in. lb.); 150/200 Amp 2.4 Nm (21 in. lb.); 300/400 Amp 6.8 Nm (60 in. lb.)

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →