Kohler — Service Procedure
For these Kohler models: RDC2 or DC2 generator set controller, RXT, TP-6808.
Applies to: Kohler Rdc2 Or Dc2 Generator Set Controller, Kohler Rxt, Kohler Tp 6808
Procedure
- 1. LED status indicator panels (optional)
- 2. Neutral
- 3. Neutral bonding jumper
- 4. Utility disconnect
- 5. Transfer switch
- 6. Emergency source connection
- 7. Load connection
- 8. Ground
- 9. Controller interface board (optional combined interface/load
Source: manual:tp6808.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.