Home›Repair guides›Kohler›Turbocharger Oil Prime Procedure

Kohler 2000ROZD — Turbocharger Oil Prime Procedure

Maintenance · Turbocharger (Ford-powered 30, 80, and 100 kW models)

For the Kohler 2000ROZD, from the Kohler operator's manual.

Applies to: Kohler 2000ROZD

Before you start

  • Ground the ignition coil to the engine block to prevent electronic ignition system damage.
  • Do not crank the engine continuously for longer than 10 seconds. Allow a 60-second cooldown period between cranking cycles.

Procedure

  1. Place the generator set master switch in the OFF/RESET position.
  2. Disconnect the wire between the ignition coil and the distributor at the distributor terminal. Connect a jumper from the ignition coil lead to the engine block.
  3. Place an oil-collection container under the oil drain line. Disconnect the turbocharger oil drain line at the engine connection.
  4. Place the master switch in the RUN position to crank the engine until fresh oil flows from the turbocharger oil drain line.
  5. Place the generator set master switch in the OFF/RESET position.
  6. Reconnect the turbocharger oil drain line at the engine connection.
  7. Remove the jumper wire and reconnect the ignition coil wire to the distributor.
  8. Place the master switch in the RUN position, run the generator set a few minutes, and check for oil leaks at the drain line connection. Stop the generator set.
  9. Check the oil level. Add oil to bring the level up to the full mark.
  10. Wipe up spilled oil and dispose of rags in a fireproof container.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Consult the engine operation manual for oil capacity

Full service-parts list: Kohler 2000ROZD →

Source: Kohler operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →