Kohler 14RES / 20RES — Set Exerciser
Operation · Controller
For the Kohler 14RES / 20RES, from the Kohler service manual.
Applies to: Kohler 14RES, Kohler 20RES
Procedure
- Press AUTO button on controller.
- Press down arrow (RDC) or exercise button (DC) to start unloaded exercise; EnLd displayed.
- For Kohler RRT transfer switch, press again after engine starts for loaded exercise; E Ld displayed.
- After 20 minutes verify exercise ends and engine shuts down; loaded exercise runs 5 minutes or until cool, then shuts down.
Specs & values
- Exercise runs every seven days at same time started.
Full service-parts list: Kohler 14RES →, Kohler 20RES →
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.