Home›Repair guides›Kohler›Field-Connection Terminal Block Wiring

Kohler 14RES / 20RES — Field-Connection Terminal Block Wiring

Installation

For the Kohler 14RES / 20RES, from the Kohler service manual.

Applies to: Kohler 14RES, Kohler 20RES

Before you start

  • Hazardous voltage.
  • Backfeed to utility.

Procedure

  1. Drill holes for conduit fittings; feed cables through openings.
  2. Connect transfer switch emergency source leads to L1 and L2 on terminal block.
  3. Connect neutral (L0) and ground (GRD) from ATS and main panel.
  4. For RRT transfer switch, connect interface panel to ATS1--ATS4 before connecting engine starting battery.
  5. For RDT/RSB transfer switch or remote start/stop, connect engine start leads to terminals 3 and 4.
  6. Connect utility power to terminals labelled Utility; source must be GFCI protected.

Specs & values

  • Route low-voltage communication leads through separate conduit.

Full service-parts list: Kohler 14RES →, Kohler 20RES →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →