Home›Repair guides›Isuzu›Work procedure for Loctite (bolt application)

Isuzu 4LE2 — Work procedure for Loctite (bolt application)

Maintenance · Bolts using Loctite

For the Isuzu 4LE2, from the Isuzu service manual.

Applies to: Isuzu 4LE2, Isuzu 4LE2 engine

Before you start

  • After tightening the bolt, do not apply excessive torque or try to rotate the bolt until at least one hour has passed and the Loctite has hardened.

Procedure

  1. Wipe the joint surfaces of the bolt, bolt hole, and threads clean of water, grease, and oil. The contact surfaces should be dry.
  2. Apply Loctite to the top 1/3 of the screw.
  3. Tighten the bolt to the specified torque.

Specs & values

  • Apply Loctite to the top 1/3 of the screw

Full service-parts list: Isuzu 4LE2 →, Isuzu 4LE2 engine →

Source: Isuzu service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Isuzu repair guides →