Home›Repair guides›Isuzu›Procedure for using the plastigauge (example: connecting rod bearing to crank pin clearance)

Isuzu 4LE2 — Procedure for using the plastigauge (example: connecting rod bearing to crank pin clearance)

Adjustments · Connecting rod bearing / crank pin

For the Isuzu 4LE2, from the Isuzu service manual.

Applies to: Isuzu 4LE2, Isuzu 4LE2 engine

Before you start

  • Do not move the connecting rod while using the plastigauge.

Procedure

  1. Clean the connecting rod and bearing, and install the bearing to the rod.
  2. Cut the plastigauge to the same width as the crank pin, and lay the gauge parallel to the pin avoiding the oil hole.
  3. Line up the marks on the connecting rod and cap and install the crank pin.
  4. Apply molybdenum disulfide to the thread section and seating surface of the tightening bolt, and rotate both cap and bolt to the correct torque.
  5. Gently remove the cap and connecting rod, and measure the crushed width of the plastigauge using the scale printed on the bag.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • PG-1 (Green) measurable range 0.025 - 0.076 mm {0.001 - 0.003 in}
  • PR-1 (Red) measurable range 0.051 - 0.152 mm {0.002 - 0.006 in}
  • PB-1 (Blue) measurable range 0.102 - 0.229 mm {0.004 - 0.009 in}

Full service-parts list: Isuzu 4LE2 →, Isuzu 4LE2 engine →

Source: Isuzu service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Isuzu repair guides →