Generac QuietPact 40 — Testing Under Load

Installation · Generator

For the Generac QuietPact 40, from the Generac owner's manual.

Applies to: Generac QuietPact 40, Generac GN-220 engine

Before you start

  • You must not allow the unit to overheat during prolonged operation.

Procedure

  1. Apply electrical loads equal to about 75 to 100 percent of the unit's rated wattage/amperage capacity.
  2. Let the unit run at least 30 minutes with load applied.
  3. Check that the unit is not running excessively hot and that adequate cooling airflow is available.
  4. Do not allow the unit to overheat during prolonged operation.

Specs & values

  • Run at least 30 minutes with load applied