Home›Repair guides›Generac›Checking Automatic Operation

Generac G0072100 — Checking Automatic Operation

Operation · Generator and transfer switch

For the Generac G0072100, from the Generac service manual.

Applies to: Generac G0072100

Procedure

  1. Verify generator is OFF.
  2. Install front cover of transfer switch.
  3. Turn on utility power supply to transfer switch.
  4. Set generator MLCB to ON (CLOSED).
  5. Press AUTO button.
  6. Turn off utility power supply; engine cranks after five second delay and transfers after 5 or 30 second delay.

Specs & values

  • five second start delay (factory default)
  • 5 or 30 second transfer delay

Full service-parts list: Generac G0072100 →

Source: Generac service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Generac repair guides →