Home›Repair guides›Fischer Panda›Isolation test after installation

Fischer Panda Panda 5000i.Neo PMS — Isolation test after installation

Installation · Electrical system

For the Fischer Panda Panda 5000i.Neo PMS, from the Fischer Panda owner's manual.

Applies to: Fischer Panda Panda 5000i.Neo PMS, Fischer Panda FPE-320 engine

Before you start

  • Only an electrician may carry out installation of electrical connections.

Procedure

  1. Switch off all electrical load.
  2. Start generator.
  3. Measure AC voltage with voltmeter between generator housing and AC-Control box.
  4. Measure AC voltage between generator housing and ground.
  5. Measured voltage must not exceed 50 mV.
  6. Check installed safety systems and RCD if present.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Maximum measured voltage 50 mV

Source: Fischer Panda owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.