Fischer Panda Panda 5000i.Neo PMS — Isolation test after installation
Installation · Electrical system
For the Fischer Panda Panda 5000i.Neo PMS, from the Fischer Panda owner's manual.
Applies to: Fischer Panda Panda 5000i.Neo PMS, Fischer Panda FPE-320 engine
Before you start
- Only an electrician may carry out installation of electrical connections.
Procedure
- Switch off all electrical load.
- Start generator.
- Measure AC voltage with voltmeter between generator housing and AC-Control box.
- Measure AC voltage between generator housing and ground.
- Measured voltage must not exceed 50 mV.
- Check installed safety systems and RCD if present.
Tools required
- voltmeter Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- Maximum measured voltage 50 mV
Source: Fischer Panda owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.